Senior Lecturer
Mr Kudzai Musiwa
Qualifications: MPhil Environmental (UZ) 2004; PGrad dipMex in Meneral Exploration (ITC-Netherlands) 1996; Post Grad.Cert Pollution Tracing Techniques (Graz, Austria); Geology (Luton, UK) 1993
Research Interests: Environmental Impact Assessment; Waste Disposal; Environmental Management Planning; Mine rehabilitation; Acid Mine and Acid Rock Drainage; Pollution Tracing; Alluvial Mining; Mineral Geochemical Exploration
Publications
- Seedwel Ravengai, David Love, Maideyi Mabvira-Meck, Kudzai Musiwa and William Moyce Water quality in an abandoned gold mining belt, Beatrice, Sanyati valley, Zimbabwe. Physics and Chemistry of the Earth 30 (@005) 826 – 831.
- Emmanuel Zingoni, David Love, Chris Magadza, William Moyce and Kudzai Musiwa. Effects of a semi-formal urban settlement on groundwater quality Epworth (Zimbabwe): Case study and groundwater quality zoning. Physics and Chemistry of the Earth 30 (2005) 680-688.
- C Magombedzi, K L Sandvik, B Manda and K Musiwa. Geochemical Controls on Acid Mine Drainage Generation, Neutralisation Treatment and Attenuation at Iron Duke Mine. Metallurgical Plant Design and Operating Strategies (MetPlant 2006) 18 - 19 September 2006 Perth, WA
- Kudzai Musiwa, David Love and Richard Owen. Secondary Minerals as indicators of pollution, Athens Mine, Sanyati catchment, Zimbabwe. Proceeding of the International conference on Hydrological Perspectives for Sustainable Development (HYPESD -2005), (941-951 India.
- Musiwa K., Love D. and Owen R. Impact of a Gold Mine on water Systems – Athens Mine, Mvuma, Zimbabwe. Proceedings of the 1st SANREN Conference and Exhibition, Gaborone, Botswana, 2004.
Book Chapters
- Chapter 6 in Diffuse pollution of Water resources: Principles and case studies in the Southern African region. Editor R. Hranova. ISBN 0415383919. Pages 117 – 130. Love D., Zingoni E., Gandidzanwa P., Magadza C. and Musiwa K. Impacts on groundwater quality and water supply of the Epworth semi-formal settlement, Zimbabwe.
- Chapter 7 in Diffuse pollution of Water resources: Impacts of a solid waste disposal site and a cemetery on the groundwater quality in Harare, Zimbabwe. Moyce W., Love D., Musiwa K., Nyama Z., Mangeya P., Ravengai S., Wuta M. and Zingoni E.
Environmental detailed reports
- Gungutswa Gold Mining project in Nyanga - for gold extraction and exploration.
- Syndicate 96 Gold Mining project in Christone Bank area - for the gold extraction of gold
- Goora Gold Mining project in Madziwa - for gold extraction.
- Vundhla Gold Mining project in Chegutu - for gold extraction.
- Mungari Gold Mining Project in Shamva - for gold extraction.
- Geo Associates Step Lively Gold project in Chegutu - for gold extraction and processing plant.
- Ruschrome Platinum mining project on the Great Dyke Darwendale Section - for platinum exploration and extraction.
- Pull Power Mining project in Kadoma - for gold extraction.
- Mbada Diamond Mining in Chiadzwa, Marange - for the relocation of communities, extraction for alluvial diamonds and setting up of a diamond sorting plant.
- First Access chrome mining project in Mapinga Area, Great Dyke - for eluvial chrome extraction.
- Northridge platinum exploration project in Selous area, Great dyke - for platinum exploration.
- Mugomo Irrigation Project in Marange Communal Area which involved construction of a pump station and canals for irrigation.
- Lake Kariba Crocodile Farm, construction and sand extraction project
Professional Membership
- Zimbabwe Institute of Engineering (ZIE)
- Geological Society of Zimbabwe (GSZ)
- Southern African Institute of Mining and Metallurgy (SAIMM)